Under construction · March 2026 — March 2027

The LEED Platinum headquarters
built by the very companies it sells

Campus CIAE is the Grupo Empresarial CIAE headquarters — a building designed, installed and operated by its own 8 brands. 14 recycled shipping containers, 100 kWp photovoltaic and 120% net generation. Dual target LEED v5 Platinum + EDGE.

Main entrance of Campus CIAE on a sunny day

Architectural render

Main entrance · Predio Benjamina, Hermosillo

Consulting by · Registered with · Academic partners

Tribo Soluciones Sostenibles USGBC (LEED v5) IFC · World Bank (EDGE) UTH (signed agreement) UNISON (in development)

The project in numbers

What gets measured, improves

100kWp

Installed photovoltaic system

14

Reused shipping containers

120%

Generation vs consumption

~6,000

Campus surface area

Panoramic view of Campus CIAE complex

The project in 60 seconds

Build with purpose, operate with excellence

  • March 2026 — Design kickoff with Tribo Soluciones Sostenibles
  • Sept 2026 — Design completion + LEED Online registration
  • Jan 2027 — Soft opening + IAQ testing
  • March 2027 — LEED v5 Platinum certification
See the full project →

Dual certification

Two certifications, one headquarters

108 anticipated points out of 110 possible. +28 points above Platinum minimum.

USGBC

LEED v5

Platinum

IFC · World Bank

EDGE v3.1

Advanced

Campus CIAE is not a building that meets LEED. It's the public proof that the coherence between what the group says and what the group builds is not an idea — it's a place.

Joaquín Corella Puente, Eng.

General Director · Grupo Empresarial CIAE

Visit the Campus

If you're a client, partner, student or press, schedule a visit. We'll show you the operational PV system, the inverter showroom and the construction process live.

Schedule a visit →