U.S. Green Building Council
LEED v5 BD+C New Construction
Platinum
Primary objective
Most current market standard (launched April 2025, certification open November 2025). All 4 mandatory credits for Platinum are covered.
108 / 110 anticipated
The certifications
Campus CIAE simultaneously targets LEED v5 Platinum and EDGE v3.1 Advanced. Two independent frameworks (USGBC + IFC of the World Bank) validate the same design decisions. Turnkey consulting by Tribo Soluciones Sostenibles.
LEED v5 Scorecard
Anticipated points
Platinum minimum
Safety margin
The two certifications
U.S. Green Building Council
Platinum
Primary objective
Most current market standard (launched April 2025, certification open November 2025). All 4 mandatory credits for Platinum are covered.
108 / 110 anticipated
IFC · World Bank
Advanced
Complementary certification
Certification from IFC (International Finance Corporation, World Bank). International cross-validation. Leverages Tribo's technical analysis and reinforces compliance proof.
40%+ reduction in 3 categories
Why two
A single certification can be questioned. Two independent certifications — USGBC and IFC of the World Bank — validating the same thing from different methodologies reduce the doubt space.
LEED v5 is the most demanding technical standard in the North American sustainable building market. EDGE is the IFC metric for emerging markets, focused on quantifiable reduction of water, energy and embodied carbon consumption. That both frameworks — developed by independent organizations, with different methodologies, evaluating buildings from different markets — agree in validating Campus CIAE\'s decisions makes the decision verifiable engineering, not marketing.
The 4 mandatory
LEED v5 establishes 4 credits that must be obtained at 100% to reach Platinum level. Campus CIAE covers them all.
Project priority: PR1
Project priority: PR4
The LEED consultant
"Campus CIAE doesn't seek the certificate for the certificate's sake. It seeks to demonstrate that in Mexico we can build under global standards without shortcuts. That's why we contracted turnkey consulting with cross-validated dual certification."
Arch. Glenda Saucedo · General Director of Tribo Soluciones Sostenibles
Accreditations
Previous cases
AIFA · Ford · Toyota · Tec de Monterrey · Mabe · Kia · Banorte
Timeline
March 2026
Conceptual design, site analysis, preliminary scorecard
April — June 2026
Executive design, dynamic energy model, LCA, daylighting
September 2026
Preliminary certification issued. Construction kickoff.
Sep 2026 — Feb 2027
Tribo audits construction. Continuous evidence documentation.
February 2027
Pre-occupancy IAQ testing + enhanced commissioning
March 2027
Issuance of LEED v5 Platinum + EDGE Advanced
Scorecard summary
The full interactive scorecard (individual credits with filters) arrives in Phase 3. Meanwhile, this category-level summary reflects the current state.
| Category | Possible | Anticipated |
|---|---|---|
| IP Integrative Process | 1 | 1 |
| LT Location & Transportation | 15 | 8 |
| SS Sustainable Sites | 11 | 11 |
| WE Water Efficiency | 9 | 9 |
| EA Energy & Atmosphere | 33 | 30 |
| MR Materials & Resources | 18 | 18 |
| EQ Indoor Environmental Quality | 13 | 13 |
| PR Project Priorities | 10 | 10 |
| TOTAL | 110 | 108 |
Last updated: 2026-05-20 · Reviewed by: Tribo Soluciones Sostenibles (versión interna, pendiente validación formal)